Metal Truss Installation
Cold-formed steel truss setting and metal roof framing for commercial and institutional buildings.
Request a BidWe set trusses. Cold-formed steel trusses and joists craned into place, braced and bridged square to the structural drawings, then framed out to receive deck and sheathing.
Scope Detail
What We Install
01
Truss Setting & Crane Work
Trusses staged, picked and set to the structural layout, plumbed and squared before release.
02
Metal Roof Framing
Roof framing, outriggers and overhangs built to the architectural roof plan.
03
Bracing & Bridging
Permanent bracing and bridging installed per the truss engineer’s drawings.
04
Coordination With the Steel Erector
Our set sequence is planned around the structural steel and the crane schedule already on site.
05
Roof Sheathing Support
Framing left ready for deck, sheathing and the roofing trade behind us.
Truss Specifications
Type
Cold-Formed Steel Trusses
Installation
Crane-Set
Spans
Per Truss Engineer’s Drawings
Stability
Bracing & Bridging
Safety
Fall Protection on All Elevated Work
Why GCs Use Us for Trusses
01
Crews sized to your schedule
Manpower added floor by floor to hold your milestone.
02
Coordinated with the trades around us
Blocking, backing and penetrations resolved before we close up.
03
100% PPE, OSHA-trained crews
Fall protection on all elevated work, every day.
04
Bids returned in 48–72 hours
Takeoff from your drawings, priced by scope line.
Trusses in the Field
Truss Gallery

Institutional
Cold-formed steel trusses set with a crane — Texas

Commercial
Aerial view of metal roof framing complete — Texas

Sports & Recreation
Long-span roof framing at a recreation facility — Texas
Truss Questions
FAQ
Do you provide the crane?
We can carry the crane and rigging in our scope, or work off the crane already mobilized on site — tell us which with the bid request.
What spans do you work with?
Spans are priced from the truss engineer’s drawings and the lift plan — send them with the bid request.
Do you coordinate with the steel erector?
Yes. The set sequence is planned around the structural steel so neither trade waits on the other.
Do you frame the roof deck?
We frame to receive deck and sheathing, and can carry the sheathing as a scope line.
What is your safety protocol at height?
100% PPE, fall protection on every elevated task, and a daily toolbox talk before the first pick.
Related Services
Metal Framing
Interior, exterior and load-bearing light-gauge steel.
View Service →
DensGlass & Exterior Sheathing
Weather-barrier ready exterior board, taped and detailed.
View Service →
Ceilings
Acoustical grid and hard lid ceilings.
View Service →
Have a Truss Package Out for Bid?
Send us the plans. We’ll return a bid within 48–72 hours.
